Land remodel 001

BATH REMODEL:

BEFORE – This shows the bathroom following removal of its original wall and floor tile which was still in pristine condition but outdated for the customer’s taste.  It was green and black art deco bathroom tile from the 1970’s.  The bathroom was completely gutted; everything was taken out – all of the tile, the ceiling, a cast iron tub, toilet, etc.

 

 

 

White vanity 003

 

 

 

READY FOR DELIVERY:  The vanity has been completed – made from solid Maple, sprayed with paint and clear-coat.  Ready for delivery and installation.

 

 

 

 

Full.view

 

AFTER – Now with the granite and hardware installed, this customer has an awesome custom vanity with drawers, cabinets, etc., all built to meet their specifications.

 

 

 

 

 

 

 

vanity.mirror

Beautiful and simple…